Pdf Summary
Keywords
deep excavation
cut-and-cover metro tunnel
Kolkata
secant pile wall
PLAXIS 2D
Hardening Soil Model
groundwater control
bottom heave stability
tube-a-manchette grouting
urban excavation monitoring
Powered By