false
OasisLMS
Login
Catalog
Artificial Ground Freezing: A Smart Application Be ...
Video
Video
Back to course
[Please upgrade your browser to play this video content]
Video Transcription
Video Summary
Trevi and GFWA used artificial ground freezing for three cross-passages on Perth’s Forrestfield–Airport Link, a rail project connecting the eastern suburbs and airport to the city network. Because the passages lay beneath an operational airport taxiway, drilling had to be carried out from inside the tunnels. Ground conditions included water-bearing sand and gravel, with groundwater pressure around two bar.<br /><br />Detailed soil testing and thermal and structural analyses informed the freezing-pipe layout, accounting for restricted drilling zones, tunnel joints and a large temporary steel structure. The design required a frozen soil body at an average temperature of −10°C, while limiting frost heave to 1.5 cm. Two electric drilling machines installed about 300 pipes; deviation averaged 1%, with only two clashes.<br /><br />Chillers and extensive temperature, pressure and ground monitoring supported the freezing and maintenance phases. Data was shared with project stakeholders every 30 minutes. Despite technical challenges, the frozen ground performed as designed, and the cross-passages were successfully completed.
Keywords
artificial ground freezing
Forrestfield-Airport Link
cross-passages
groundwater pressure
frost heave
×
Please select your language
1
English