Building Class A Development Over Landfill
PPT Presentation
PPT Presentation
Back to course
Pdf Summary
The Sole Mia development demonstrates how closed landfills can be developed when their variable ground conditions are carefully investigated and managed. The 193-acre site operated as a landfill in the 1970s and closed in 1980. Its heterogeneous landfill layer is about 20–25 feet thick, overlying limestone and sand. Although most self-weight settlement of the old landfill was considered complete, monitoring and test sections showed that long-term creep could continue.<br /><br />Pilot test sections compared deep dynamic compaction (DDC), surcharge preloading, and combinations of the two. About 80–90% of primary settlement occurred within a month after preload placement. DDC reduced settlement compared with untreated areas, while two passes performed similarly to four. Areas where surcharge was removed showed little subsequent creep; areas where it remained continued to settle. The project therefore used DDC and preload for settlement-sensitive features, DDC alone for roads and parking away from buildings, and neither where ground was structurally supported or not settlement-sensitive.<br /><br />Typical preloads were 5 feet over DDC-treated ground and 10 feet over untreated ground. Buildings were supported on augered cast-in-place piles embedded in competent rock. Installing piles through landfill required waste predrilling or localized removal; tires and other obstructions created challenges, particularly for larger piles.<br /><br />Key lessons include the importance of site-specific test sections, monitoring, and combining ground-improvement methods to control long-term settlement. Improved areas experienced ongoing settlement, generally around 1/5 to 1/8 inch per year in DDC areas and closer to 1/10 inch per year where DDC and preload were combined. The project also showed that piles can be installed successfully through landfill, but larger-diameter piles may require casing or other specialized techniques.
Keywords
closed landfill
ground settlement
deep dynamic compaction
surcharge preloading
landfill remediation
soil improvement
pilot test sections
augured cast-in-place piles
long-term creep
site-specific monitoring
×
Please select your language
1
English