false
OasisLMS
Login
Catalog
Building Class A Development Over Landfill
Video
Video
Back to course
[Please upgrade your browser to play this video content]
Video Transcription
Video Summary
Langan engineers described the geotechnical challenges of building luxury, Class A developments over a closed landfill in North Miami. The 193-acre site contains 20–25 feet of highly variable waste, creating risks from settlement, unstable foundations, damaged utilities, contamination, and methane. Because landfill material had to remain on-site, three test sections evaluated deep dynamic compaction (DDC) and preload performance.<br /><br />Tests showed that 80–90% of primary settlement occurred within about a month. DDC reduced settlement, and two passes proved sufficient; combining DDC with preload and then removing the preload minimized long-term creep. Recommendations varied by site use, with both methods used near settlement-sensitive structures.<br /><br />Buildings were supported on auger-cast piles extending into underlying limestone and cemented sand. Large-diameter piles required predrilling to identify and remove obstructions, especially tires. Long-term monitoring indicates infrastructure settlement is below 0.1 inch annually. The project demonstrates the value of site-specific testing, tailored ground improvement, and ongoing monitoring when developing landfills.
Keywords
North Miami landfill development
geotechnical engineering
deep dynamic compaction
preload settlement testing
auger-cast piles
ground improvement monitoring
×
Please select your language
1
English