false
OasisLMS
Login
Catalog
Challenges of Building the Deepest Basement in Dow ...
Video
Video
Back to course
[Please upgrade your browser to play this video content]
Video Transcription
Video Summary
The 200 Park Avenue project in downtown San Jose involved a 19-story office building with four basement levels, requiring an excavation 54–58 feet deep. Key challenges included limiting movement near neighboring buildings and utilities, managing shallow groundwater, and preventing heave from artesian pressure in a deep sand layer.<br /><br />The team selected a stiff, 39-inch-thick cutter soil mix wall, extending 135–140 feet to cut off the sand layers. Four levels of tiebacks supported the wall. Dewatering lowered groundwater inside the excavation while limiting drawdown outside; wells also depressurized the artesian layer to maintain an adequate safety factor against heave.<br /><br />Monitoring during construction showed the system performed as designed. Groundwater outside the excavation dropped only slightly, wall deflections were generally around half an inch, and settlements were minor. The excavation remained dry and stable, allowing the mat foundation and waterproofing to proceed. The project’s success depended on close collaboration among the design and construction teams.
Keywords
200 Park Avenue
San Jose excavation
cutter soil mix wall
dewatering system
artesian pressure control
deep foundation excavation
×
Please select your language
1
English