false
OasisLMS
Login
Catalog
Challenges of Designing and Constructing CFA Piles ...
Video
Video
Back to course
[Please upgrade your browser to play this video content]
Video Transcription
Video Summary
The presentation described the design and construction of CFA piles for a 19-story mixed-use development at 4650 Broadway in northern Manhattan. The site lies near the Inwood Hill Thrust Fault, creating highly variable conditions: shallow competent marble or schist in some areas, deep decomposed rock in others, and zones where competent bedrock was not encountered.<br /><br />CFA piles were selected to accommodate these conditions, simplify construction near existing buildings, and avoid switching between drilled piles and caissons. An extensive program of 15 index piles and 12 load tests evaluated compression, tension, and lateral performance. Results confirmed that piles could support design loads in both competent and decomposed rock, while informing adjustments to pile lengths and tension capacity.<br /><br />Automated drilling monitoring and thermal integrity profiling supported quality control. The team established pile acceptance criteria combining minimum length and embedment with drilling rate and rig crowd pressure. The project demonstrated the value of load testing, experienced contractors, robust quality controls, and close communication among design and field teams.
Keywords
CFA piles
foundation design
load testing
Inwood Hill Thrust Fault
thermal integrity profiling
mixed-use development
×
Please select your language
1
English