A deep-construction engineer described planning the safe demolition of a 22-story reinforced-concrete building with three basement levels. The upper floors were imploded toward a designated area, while the basement was mechanically demolished to create space for the debris. Because a new soldier-pile-and-lagging shoring system stood only four to five feet from the existing basement, demolition had to be carefully sequenced: removing basement walls and slabs changed the structure’s support and the soil pressures acting on the shoring. The team coordinated demolition stages, tieback installation, equipment access, and temporary platforms, while checking the capacity of the thin basement walls and slabs. Construction debris helped support lower-level slabs; loads were spread out at the first basement level. The implosion was successful, with no reported damage to the shoring or nearby structures. The presentation also noted the terminology varies by region—“support of excavation,” “shoring,” and “temporary earth-retention system”—and emphasized thorough engineering for demolition safety.
Keywords
reinforced-concrete demolition
building implosion
basement shoring
support of excavation
temporary earth-retention system
demolition sequencing
×
Please select your language
1
English