Complex Logistical Constraints and their Technical ...
PPT Presentation
PPT Presentation
Back to course
Pdf Summary
The presentation describes shoring and excavation-support design for Zones 12 and 13A of Ottawa’s Confederation Line Extension, part of the City of Ottawa’s Stage 2 O-Train project. Delivered under a design-build contract by the Kiewit-Eurovia-Vinci joint venture, the wider Confederation Line West adds 15 km of rail, 11 stations, and tunnel segments.<br /><br />The case study focuses on how site and logistical constraints influenced support-of-excavation (SOE) design and construction. Zone 13A used internally braced secant piles, while Zone 12 used internally braced soldier piles and lagging. The presentation also highlights utility support, a watertight transition, and bulkhead removal as additional logistical and technical challenges. Construction photographs document work carried out on the project.
Keywords
Confederation Line Extension
Ottawa Stage 2 O-Train
shoring design
excavation support
Zone 12
Zone 13A
secant piles
soldier piles and lagging
utility support
watertight transition
×
Please select your language
1
English