Construction Sequence for Settlement Control at Br ...
PPT Presentation
PPT Presentation
Back to course
Pdf Summary
The presentation describes a construction sequence used to control settlement at bridge end bents and reduce downdrag on HP piles for the NCDOT U-5026/R-5720 project near the Atlantic Seaboard Fall Line. Local soils include terrace deposits of soft-to-medium-stiff silts and clays and loose-to-medium-dense sands over Piedmont residual soils and weathered rock.<br /><br />Under conventional construction, the estimated downdrag cutoff depth was 40 feet and pile drag load was 95 kips. The reported RnR values were 620 kips with limited PDA testing and 500 kips with sufficient PDA testing. With stage construction, the cutoff depth decreased to 20 feet and drag load to 12 kips; reported RnR values decreased to 440 and 350 kips, respectively.<br /><br />Settlement monitoring tracked an abutment wall and a roadway embankment. The presentation concludes that Piedmont residual silts and clays consolidate quickly, and that stage construction combined with pile restriking can reduce drag load. A pile restrike was recorded on December 21, 2022.
Keywords
bridge end bents
settlement control
downdrag reduction
HP piles
stage construction
NCDOT
PDA testing
pile restrike
Piedmont residual soils
abutment settlement
×
Please select your language
1
English