false
OasisLMS
Login
Catalog
Construction of a New Quay Wall for a Sea Tank Ter ...
PPT Presentation
PPT Presentation
Back to course
Pdf Summary
The project at Belgium’s Port of Antwerp involved replacing an 800-metre quay wall in Kanaaldok B2, designed for a water depth of 18 metres. Antwerp is a major European port, with 160 kilometres of quayside and extensive shipping and petrochemical operations.<br /><br />The construction presented challenges related to local glauconite ground conditions and the demanding pile design. The plan included 270 tubular piles, each 28 metres long and weighing 42 tonnes, together with double sheet piles and 43-metre-wide-flange beams.<br /><br />A key element was the MV-Pile, or jacket-grouted pile: a steel beam with a specially shaped foot. As the pile is driven, grout is continuously injected under pressure. At the required depth, the grout hardens into a cement “root” around the foot, increasing load-bearing capacity and enabling the pile to resist high tensile loads.<br /><br />Liebherr pile-driving rigs provided the equipment used for the project.
Keywords
Port of Antwerp
Kanaaldok B2
quay wall replacement
pile driving
tubular piles
glauconite ground
MV-Pile
jacket-grouted pile
Liebherr rigs
marine construction
×
Please select your language
1
English