Video Transcription
Video Summary
The presentation describes a value-engineered foundation for the MD-152 interchange reconstruction on I-95 in Maryland. To replace 107 battered micropiles beneath Abutment B, the team designed 119 plumb, 18-inch continuous flight auger (CFA) piles, each approximately 40 feet long. The alternative maintained the existing abutment footprint and limited lateral deflection while avoiding vibration risks to a nearby 108-inch water main.<br /><br />Because AASHTO provides little CFA-specific guidance, the team followed FHWA’s GEC No. 8 and used a factor of safety of two. Subsurface conditions included silt over saprolite; CPT and SPT data informed capacity estimates. Group analysis evaluated 82 load cases across four construction phases, including lateral pile-group effects. A test pile failed at 574 kips, supporting an estimated capacity of about 490 kips versus the 400-kip design value.<br /><br />Structural design required checking steel casing strength, pile fixity, and footing reinforcement. Wing walls required a different, larger CFA design because of spacing and load constraints.
Keywords
MD-152 interchange
continuous flight auger piles
foundation redesign
Abutment B
FHWA GEC No. 8
pile group analysis
×
Please select your language
1
English