false
OasisLMS
Login
Catalog
Dakota-Federal 42X-36 Well Pad Stabilization
Video
Video
Back to course
[Please upgrade your browser to play this video content]
Video Transcription
Video Summary
Braun Intertec and VITE stabilized a North Dakota well pad affected by historic landslides and soft, water-sensitive soils. Monitoring detected accelerating movement in 2022, including elevated pore pressure in a deep lignite layer. Engineers used site investigations and numerical modeling to design a 705-foot anchored soldier-pile wall, with deeper piles through the lignite layer.<br /><br />During construction, heavy rain reactivated the slide, shifting three installed piles several feet. The team quickly drove 98 temporary steel piles along the slope, monitored movement, and resumed construction from a safer bench. The wall and anchors were completed by August 2022.<br /><br />Post-construction surveys show the wall remains stable. Inspections have found cracking and creep downslope, but the temporary piles appear to limit movement in the area they reinforce. Monitoring continues to track performance and distinguish slope movement from any impact on the wall.
Keywords
North Dakota well pad
landslide stabilization
anchored soldier-pile wall
lignite layer
slope monitoring
temporary steel piles
×
Please select your language
1
English