false
OasisLMS
Login
Catalog
Design and Field Comparison of Ground Improvement ...
Video
Video
Back to course
[Please upgrade your browser to play this video content]
Video Transcription
Video Summary
Vijay of Bauer presented two case studies comparing ground improvement and pile foundations for large steel water tanks. Because excessive or differential settlement can damage tank plates, welds, and piping, foundation solutions must meet project-specific settlement limits.<br /><br />At Al-Lith, a 50 m tank was founded on stone columns extending 17 m, with load tests confirming performance. A nearby 41 m tank had much weaker, deeper soils, so it was supported on 138 piles extending 42.5 m. At Dammam–Khobar, three 106 m tanks were built on stone columns in clean sand. Post-treatment CPTs showed increased cone resistance, and a zone load test measured less settlement than predicted.<br /><br />Vijay concluded that no single foundation solution suits every site: ground improvement can be a reliable, potentially more sustainable alternative to piles when soil conditions permit and performance is carefully verified. During discussion, he explained that tank settlement is monitored during hydrostatic filling; testing was still underway for one project.
Keywords
ground improvement
pile foundations
steel water tanks
stone columns
settlement monitoring
×
Please select your language
1
English