false
OasisLMS
Login
Catalog
Difficulties in Jetting Inside a Underground Stati ...
Video
Video
Back to course
[Please upgrade your browser to play this video content]
Video Transcription
Video Summary
The presentation describes jet grouting for the underground section of the Porte Maillot station, part of the RER E extension in Paris. The 225-metre station lies among existing metro lines, an underground car park and historic buildings, with ground comprising marls, limestone and sand. To avoid delaying excavation when groundwater drawdown slowed, jet grouting was carried out from two adjacent galleries. The works involved 351 columns, about 5.5 kilometres of drilling and nearly 3 kilometres of jetting, using a primary-secondary sequence.<br /><br />A major challenge was removing spoil through a long, constrained route shared with other contractors. Unexpected lignite in the spoil absorbed water, making it dry and difficult to pump; blockages threatened the schedule. Traditional hose filters helped only partly. Additional screening and a deflocculating synthetic polymer improved filtration and pumping without adversely affecting the grout’s viscosity, bleeding or strength.
Keywords
jet grouting
Porte Maillot station
RER E extension
groundwater drawdown
spoil filtration
×
Please select your language
1
English