false
OasisLMS
Login
Catalog
Downhole Magnetic Gradiometry for Estimating the L ...
PPT Presentation
PPT Presentation
Back to course
Pdf Summary
The presentation examines downhole magnetic gradiometry (DMG) as a method for estimating the length of existing bored piles, particularly when the pile head is inaccessible. A geophysical tool is lowered into a PVC-cased borehole drilled near the pile to detect the base of its steel reinforcement cage. The method assumes the reinforcement extends to the pile toe, so reinforcement curtailment can lead to an inaccurate estimate.<br /><br />A November 2024 field trial tested up to five 3 m-long N24 reinforcing bars in an ungrouted model pile. Boreholes were positioned 0.5 m, 2 m and 3 m from the pile. Tests showed that individual bars produced complex magnetic fields; using the commonly applied “lowest peak” interpretation, the estimated bar depth averaged 2.74 m against an actual length of 3 m. Tests with multiple bars showed that bar arrangement and orientation can substantially affect the signal, sometimes making the estimated toe unclear or incorrect.<br /><br />The trial suggests that, even under favourable conditions, DMG is unlikely to be useful beyond an offset of about 2 m; in typical practice, the borehole should be within 1–1.5 m of the pile. The lowest-peak interpretation was the most consistent approach, though it tended to be slightly conservative. Because reinforcing bars generate complex magnetic fields that combine, some configurations yield inconclusive results. DMG can therefore support pile-length investigations, but its estimates should be interpreted with awareness of these limitations and the assumption that reinforcement reaches the pile base.
Keywords
downhole magnetic gradiometry
DMG
bored piles
pile length estimation
reinforcement cage
steel reinforcement
borehole testing
magnetic fields
field trial
pile toe
×
Please select your language
1
English