false
OasisLMS
Login
Catalog
Elephant and Castle Town Centre Development - Engi ...
PPT Presentation
PPT Presentation
Back to course
Pdf Summary
The presentation describes the Elephant and Castle Town Centre development in London, focusing on engineering in the Harwich Formation near existing tunnels.<br /><br />The basement uses CFA bearing piles and secant piles. The Integrated Ticket Hall (ITH) uses deep rotary-bored bearing piles, contiguous piles and secant piles installed with polymer. Excavation levels vary across the site, with the ITH reaching approximately –11.25 mOD and –14.25 mOD. Ground investigations recorded water levels around –1 mOD and –4 mOD, and placed the base of the London Clay near –19.4 mOD.<br /><br />Temporary excavation stability was assessed using 3D analysis, with consideration of Eurocode 7 uplift checks, ground movement assessment and pressure relief. The presentation raises the question of whether clay around a tunnel constructed roughly 100 years ago may have been disturbed. It also notes that the Harwich Formation encountered during excavation to basement level B5 was generally a permeable fine sand.<br /><br />The development was reported to be close to completion. The presenter’s opinions are their own; the presentation disclaims guarantees of accuracy and endorsement by DFI.
Keywords
Elephant and Castle
town centre development
London
Harwich Formation
basement excavation
CFA piles
secant piles
rotary-bored piles
Eurocode 7
tunnel engineering
×
Please select your language
1
English