The paper reviews methods for assessing damage to buildings caused by ground movements from nearby excavations and presents an adaptive management approach for predicting, monitoring, and controlling those movements.<br /><br />Damage criteria relate building response—such as deflection, angular distortion, strain, or crack width—to tolerable limits. Because damage thresholds vary with building materials, structural form, and deformation pattern, designers should use conservative limits or conduct detailed structural analyses. Preventing all minor damage may be uneconomic, so planned repairs can sometimes be part of the project strategy.<br /><br />The adaptive approach combines finite-element simulations, field monitoring, and inverse analysis. Measurements—particularly inclinometer data, supplemented where appropriate by settlement, brace-force, or pore-pressure readings—are compared with predictions. Optimization adjusts selected model parameters to improve the fit, and the updated model predicts later excavation stages. Reliable results require realistic representation of construction sequence, initial stress and groundwater conditions, wall installation, three-dimensional effects, and soil behavior. Small-strain stiffness and recent stress history can influence predicted settlement distributions, while plane-strain models may overestimate movements in shorter excavations.<br /><br />Case studies show that parameters calibrated using early-stage observations at Chicago’s State Street excavation predicted later movements reasonably well: final computed lateral displacement was within about 15% of measurements. Parameters from that project also produced reasonable estimates at two nearby excavations in similar geology, though with some differences.<br /><br />The authors stress that a numerically optimal fit alone does not prove a model is reliable. Calibration must also be geotechnically credible: predictions should match observations adequately, and optimized parameters must remain physically reasonable. Successful application depends on the joint quality of the simulation, monitoring data, and optimization method.
Keywords
building damage
ground movement
excavation monitoring
adaptive management
finite element simulation
inclinometer data
inverse analysis
damage criteria
soil behavior
geotechnical calibration
×
Please select your language
1
English