false
OasisLMS
Login
Catalog
Failing Slab Repair for United Air Cargo Facility
Video
Video
Back to course
[Please upgrade your browser to play this video content]
Video Transcription
Video Summary
Keller repaired a settling slab at an active United Air Cargo facility in Newark, New Jersey, which had to remain open around the clock. The phased project required low-emission equipment that fit through loading docks and under low ceilings, while avoiding buried electrical conduits and minimizing disruption. Keller installed helical piles 30–33 feet deep, providing a compact, quiet, vibration-free solution with little to no spoil. Their small equipment footprint and flexible pile-section lengths made phased mobilization economical and practical. Helical piles worked well in the site’s dense sand, though their use depends on suitable soil conditions and can be limited by very stiff soils or obstructions.
Keywords
helical piles
settling slab repair
United Air Cargo facility
Newark New Jersey
phased construction
×
Please select your language
1
English