Flood Channel Bank Stabilization Innovation: Press ...
Video
Video
Back to course
[Please upgrade your browser to play this video content]
Video Transcription
Video Summary
Ian Vaz presented the Fullerton Creek Channel Phase 2 drainage project in Buena Park, California. To protect nearby homes and businesses from the noise and vibration of conventional pile driving, Orange County Public Works specified press-in piling for most of the work. From April to July 2019, contractors installed approximately 3,500 linear feet of 35–45-foot sheet piles along the creek using two machines in standard mode. The hydraulic system grips previously installed piles and uses their resistance to press in the next piles, producing minimal vibration and noise. Conventional methods were used for the first few piles at locations where setting up a reaction stand was impractical. The project improved the channel’s capacity for a 100-year storm event. Installation averaged 11.5 pairs of piles per day, and the work was completed in spring 2020.
Keywords
Fullerton Creek Channel Phase 2
press-in piling
sheet pile installation
Buena Park drainage project
Orange County Public Works
×
Please select your language
1
English