false
OasisLMS
Login
Catalog
Geotechnical Challenges and Foundation Solutions f ...
PPT Presentation
PPT Presentation
Back to course
Pdf Summary
The Mercedes-Benz Stadium project in Atlanta required foundation solutions for highly variable subsurface conditions, including historic urban fill and debris, residual soils, partially weathered rock, and bedrock at inconsistent depths. Large structural demands—especially from the retractable roof’s mega-columns—made phased investigation, design refinement, and close coordination among the owner, engineers, contractors, and foundation specialists essential.<br /><br />The team selected foundations according to ground conditions, loading, schedule, and constructability. High-capacity, rock-socketed drilled shafts supported the outer bowl and roof mega-columns where bedrock was reasonably accessible. Auger-cast-in-place (ACIP/CFA) piles were used for the outer bowl, plaza, eastern mega-columns, and bridge structures, including locations with deeper bedrock. Shallow foundations were suitable in areas with competent residual soils or after removal and replacement of unsuitable material; vibro-piers improved ground beneath portions of the lower bowl and mechanical facilities.<br /><br />Load testing and installation verification were central to the work. Drilled shafts underwent Statnamic, bi-directional, and lateral testing, while ACIP piles were load-tested across areas with differing bedrock depths. Production requirements included automated pile monitoring, confirmation of bearing conditions and embedment, shaft-bottom and rock-socket inspection, and nondestructive integrity testing.<br /><br />The project demonstrated that collaborative planning and early contractor involvement helped align foundation methods with subsurface risks and critical schedule demands. Rock-socketed shafts, ACIP piles, shallow foundations, and vibro-piers each proved effective in appropriate conditions. For bridge support, CFA piles offered a viable alternative to driven piles or drilled shafts, with reduced noise and vibration and faster installation.
Keywords
Mercedes-Benz Stadium
Atlanta
foundation design
subsurface conditions
rock-socketed drilled shafts
ACIP piles
CFA piles
shallow foundations
vibro-piers
load testing
×
Please select your language
1
English