The presentation describes the geotechnical investigation and foundation design for Atlanta’s Mercedes-Benz Stadium, a $1.6 billion project that opened in 2017. The stadium features a retractable roof, a large 360-degree video board, and LEED Platinum certification. Its adjacent green space incorporates crushed rubble from the former Georgia Dome.<br /><br />Because the site had a complex history, substantial grade changes, urban fill, and highly variable bedrock depth, the team used a phased, collaborative approach as the project design evolved. Investigations included borings, rock coring, CPTs, seismic testing, and geophysics. The resulting foundation system combined drilled shafts, auger-cast piles, shallow foundations, and vibro-pier ground improvement, selected according to location, loads, schedule, and subsurface conditions.<br /><br />Extensive load testing and monitoring refined installation criteria and validated foundation capacities. The presentation also highlights the bridge widening, where 24-inch continuous-flight-auger piles were successfully introduced under GDOT review. Temporary works for the retractable roof required specially designed crane platforms and numerous support piles.<br /><br />The speaker emphasizes that coordination among engineers, contractors, and the construction team was essential to managing technical challenges and meeting the project’s schedule.
Keywords
Mercedes-Benz Stadium
geotechnical investigation
foundation design
drilled shafts
auger-cast piles
vibro-pier ground improvement
retractable roof
load testing
urban fill
×