false
OasisLMS
Login
Catalog
Grouting at the Westlink Project –Gothenburg, Swed ...
Video
Video
Back to course
[Please upgrade your browser to play this video content]
Video Transcription
Video Summary
The West Link is a six-kilometre rail tunnel under central Gothenburg, Sweden, with three underground stations. The project crosses crystalline rock and deep clay, where groundwater drawdown could cause damaging settlements. Its grouting design uses three treatment levels, selected according to fracture conditions and strict leakage limits. Water-loss tests and statistical analysis guide adjustments, while extensive monitoring tracks groundwater, tunnel leakage, infiltration and settlement. Measurements show some sections meet requirements, though seasonal aquifer recharge has caused leakage to exceed limits elsewhere, prompting consideration of post-grouting. The presenters emphasize following and adapting the initial design, supported by continuous, reliable measurements.
Keywords
West Link
Gothenburg rail tunnel
grouting design
groundwater drawdown
tunnel leakage
×
Please select your language
1
English