The Canadian Westinghouse Building, a six-storey heritage structure at 355 King Street West in Toronto, was redeveloped as part of a project involving two residential towers and five underground parking levels. Its two street-facing façades were preserved in place while the rest of the building was demolished.<br /><br />A conventional large-diameter shoring system was impractical because of nearby gas mains, a major electrical vault, heavy traffic, and streetcar tracks that prevented lane closures. The project instead used a hybrid system of small-diameter Case 1 micropiles. Installed in two rows beneath a temporary steel façade-support frame, the piles also served as soldier piles for excavation shoring. They carried compression and tension loads from the frame and resisted lateral earth pressures. Welded steel tees supported timber lagging between piles.<br /><br />Restricted access required compact drilling rigs and careful utility protection. Where the electrical vault prevented micropile installation, the excavation face was supported with shotcrete, soil nails, and inclined rock spiles. Excavation reached its final grade in November 2016, with frost blankets installed beneath the façade. The temporary frame was to remain until the new structure could support the heritage walls.<br /><br />Monitoring showed acceptable shoring performance, with movements generally within the anticipated range. Façade movement reached a maximum of 38 mm away from the naturally stiffer site corner; although not predicted, it was judged acceptable by the structural engineer.<br /><br />The case demonstrates how micropiles can provide both façade-frame foundations and excavation support when urban congestion and utilities rule out conventional shoring.
Keywords
Canadian Westinghouse Building
Toronto heritage redevelopment
micropiles
excavation shoring
façade retention
temporary steel frame
soldier piles
utility constraints
shotcrete and soil nails
urban construction monitoring
×
Please select your language
1
English