false
OasisLMS
Login
Catalog
HS2 - Foundations for the Future
PPT Presentation
PPT Presentation
Back to course
Pdf Summary
The presentation outlines the geotechnical engineering supporting HS2, a high-capacity railway intended to improve Britain’s transport capacity and connectivity while reducing carbon emissions. The London–Birmingham route is designed for speeds of up to 360 km/h and 60 million gross tonnes per year, with slab track.<br /><br />Foundations must meet demanding requirements shaped by speed, traffic, geology, durability, environment, geography and reliability. Phase One crosses varied ground, including London Clay, chalk, the Gault and Oxford clays, and other geological formations. Engineers use both empirical evidence and analysis, supported by preliminary pile-load tests at sites including Euston, the Colne Valley Viaduct and locations along the route.<br /><br />HS2 is also trialling digital foundation practices to share design and construction information, reduce errors and capture detailed records. Major works include the Euston approach and tunnels, Old Oak Common station, the Colne Valley Viaduct, the Chiltern Tunnel and extensive earthworks. Instrumented earthworks trials measure ground movement and water pressure, while surface monitoring includes drone surveys and automated surveying equipment.<br /><br />The presentation links engineering delivery to HS2’s net-zero commitments: net zero for corporate activities by 2025, a 50% reduction in emissions by 2030, zero-carbon electricity for railway operations, offsetting residual emissions from 2035, and net-zero construction and operation from 2035. It concludes that future progress depends on learning, digital innovation, infrastructure investment and skilled people.
Keywords
HS2
geotechnical engineering
high-speed railway
foundation design
London-Birmingham route
slab track
pile-load tests
digital foundations
earthworks monitoring
net-zero emissions
×
Please select your language
1
English