false
OasisLMS
Login
Catalog
Hot Bitumen Grouting at the Avery Island Salt Mine
Video
Video
Back to course
[Please upgrade your browser to play this video content]
Video Transcription
Video Summary
The presentation described hot bitumen grouting as a specialized, thermally activated method for controlling major water inflows. Hot oil first preheats the injection system and formation; bitumen is then injected and cools, thickening into a seal. Used alongside cementitious grout, it can bind debris and plug irregular pathways. The method requires careful process control and strict safety measures because materials exceed 200°C and are pressurized.<br /><br />At Avery Island Salt Mine, conventional grouting failed to control a persistent inflow of about 100 gallons per minute. In 2020, crews completed eight bitumen injection events in a deep, poorly understood formation. More than 1,000 cubic meters of material was injected without bitumen appearing in the mine, and inflow fell to about 20 gallons per minute. The project was halted for lack of funds before completion. Despite pandemic, weather, and equipment challenges, the team considered the approach successful and a useful option for difficult inflow problems—not a universal grout.
Keywords
hot bitumen grouting
water inflow control
Avery Island Salt Mine
bitumen injection
cementitious grout
mine grouting safety
×
Please select your language
1
English