false
OasisLMS
Login
Catalog
Hybrid Grouting for Remediation of Taupo Control G ...
PPT Presentation
PPT Presentation
Back to course
Pdf Summary
The Taupo Control Gates regulate flows in the Waikato River for flood control. Built in 1941, the six underflow gates can pass peak flows of 320 m³/s. High-velocity water has caused scour and erosion in the easily eroded volcaniclastic and alluvial ground, creating voids around the sheet piles and threatening the structure’s service life.<br /><br />The remediation approach was designed to address uncertainty about the extent of the voids while preventing grout from entering the river. A grid of drilled holes was used to map voids and flow paths on the way down, then inject grout on the way up. The mapping informed ground models for analysis and helped guide the grouting operation.<br /><br />The hybrid grout comprised Part A, a cement–fly ash blend, and Part B, an activator that produces calcium hydroxide ions and triggers rapid gelation. The setting time was controlled by adjusting the mix ratio, with set times as short as five seconds.<br /><br />During grouting, pressure and flow data were used to track grout migration and assess ground response, including heave and volumetric expansion. Secondary holes provided verification of grout distribution. The presentation also noted that TAM grouting pipes could support future work.<br /><br />The project was carried out collaboratively with McConnell Dowell and Mercury.
Keywords
Taupo Control Gates
Waikato River
flood control
scour and erosion
sheet piles
ground voids
hybrid grout
TAM grouting
volumetric expansion
McConnell Dowell
×
Please select your language
1
English