Ideas to Improve Driven Pile Foundation Design and ...
PPT Presentation
PPT Presentation
Back to course
Pdf Summary
The presentation examines how installation methods and timing affect the capacity of driven piles, particularly in cohesive soils.<br /><br />Static load tests conducted too soon after installation may underestimate long-term capacity because piles gain strength through setup. At a Louisiana site, a seven-day wait yielded about 60% of full setup capacity, compared with roughly 87% after 28 days. The presentation recommends considering load tests after more than 28 days where appropriate.<br /><br />Re-driving piles after setup can substantially reduce their capacity. At the Drayton, North Dakota, and Pentre, England, sites, re-driven piles had markedly lower shaft resistance than initially driven piles. The authors caution that re-driven piles should not be used to develop empirical correlations for pile shaft resistance.<br /><br />Vibratory hammer installation can disturb supporting cohesive soils and significantly reduce pile capacity. Long installation times can also damage side resistance, especially for large-diameter, open-ended piles. Examples from the Annacis and Port Mann bridges illustrate reduced capacity associated with re-driving, prolonged installation, and vibratory driving.<br /><br />The presentation proposes a construction influence factor (CI) to account for installation effects in capacity calculations. Preliminary values include 1.0 for normally installed or closed-end piles, 0.55 for the original pile length after re-driving, 0.5 for vibratory installation, and 0.6 for slow jacking. These values are guidance only: CI can vary with conditions, and project-specific load testing is needed to confirm it.
Keywords
driven piles
installation methods
pile capacity
cohesive soils
static load tests
setup effect
re-driving
vibratory hammer
shaft resistance
construction influence factor
×
Please select your language
1
English