false
OasisLMS
Login
Catalog
Increasing Resilience of the San Francisco Waterfr ...
PPT Presentation
PPT Presentation
Back to course
Pdf Summary
The presentation describes shoreline resilience improvements for the Potrero Power Station site on San Francisco’s waterfront, an industrial site exposed to sea-level rise, strong earthquakes, variable reclaimed fill, weak Young Bay Mud, and soil contamination.<br /><br />The shoreline structures were designed for a 75-year service life through 2100. The project used a sea-level-rise allowance of 6.9 feet (2.1 m), within a broader projected range of 2.4–10.2 feet, and site-specific seismic criteria, including a peak ground acceleration of 0.46g.<br /><br />The design combines four main systems: deep soil mixing (DSM) buttresses, tie-backs anchored in DSM, a pile-supported seawall, and a pile-supported wharf. The DSM buttresses were designed to limit post-earthquake movement; the completed system’s maximum measured or calculated displacement was 2.5 inches, below the six-inch performance limit. Tie-backs anchored into the DSM provide lateral support to an existing intake structure facing substantial seismic thrust.<br /><br />The approximately 260-foot seawall is supported on piles to reduce settlement and includes a shear key for added seismic resistance. The wharf uses upper and lower levels: the upper level aligns with the raised grade for sea-level-rise adaptation, while the lower level supports access to a future floating recreational dock. Because DSM installation was limited to areas above mean high water, piles also contribute to shoreline stability. The wharf was designed for life-safety performance under applicable seismic guidance.
Keywords
Potrero Power Station
shoreline resilience
sea-level rise
deep soil mixing
seismic design
pile-supported seawall
tie-backs
wharf structure
reclaimed fill
Young Bay Mud
×
Please select your language
1
English