false
OasisLMS
Login
Catalog
Innovative Bridge Pier Installation Using the Supe ...
Video
Video
Back to course
[Please upgrade your browser to play this video content]
Video Transcription
Video Summary
The presentation covered foundation construction for the $360 million replacement of Louisiana’s Jimmy Davis Bridge over the Red River. The new four-lane bridge is being built beside the historic structure, which will remain for pedestrian and bicycle use. Contractor R.R. Cassidy is installing 45 drilled shafts across three river piers, working from barges. The shafts require custom drilling tools, polymer slurry, specialized casing and tight sequencing, including a 36-hour limit after excavation extends below the casing.<br /><br />Barge stability and restricted access ruled out a conventional fixed-mast rig. Instead, the team used a duty-cycle crane fitted with a Super Reach Attachment, which provided sufficient drilling reach while keeping the crane stable and stationary on a relatively small barge. Flooding and buried obstructions caused delays, but the team overcame them. The project highlights the value of careful planning, flexible equipment choices and collaboration among designers, contractors and manufacturers when working in challenging water environments.
Keywords
Jimmy Davis Bridge
drilled shafts
bridge foundation construction
duty-cycle crane
barges
×
Please select your language
1
English