The paper describes the installation of large-diameter steel piles at the Parker Point iron ore facility in Dampier, Western Australia, where marine construction is complicated by remote conditions, cyclones, large tides and highly variable ground. The project required 1,219 mm diameter piles to pass through rock fill and soft sediments and achieve a 2 m socket in very high-strength granite, reaching up to 170 MPa. Conventional driven or bored piling methods were considered unsuitable.<br /><br />The contractor used a reverse-circulation down-the-hole hammer with an integrated ring bit. This system could penetrate the different ground layers without changing tooling and cut an annulus to accommodate the clutches on 55 piles forming a contiguous wall. It was also used for three standalone mooring piles. Installation relied on a crawler crane and piling leader, supported by high-volume compressors and spoil-management equipment.<br /><br />Operators closely adjusted air pressure and flow, bit rotation, torque and weight to manage changing conditions and prevent blockages or jamming. Drill-cutting samples and penetration records helped identify ground conditions and determine when rock sockets met acceptance criteria. Correct alignment and positional control kept the pile clutches intact.<br /><br />Production was variable in the fill, averaging about 10 m/hour, with frequent stoppages and greater tooling wear. Drilling through calcrete and granite averaged about 3 m/hour, but progressed more consistently and with less jamming and wear. The system successfully installed the piles across the challenging profile. Although its initial equipment and material costs exceeded those of traditional methods, construction performance delivered overall time and cost savings and reduced design and constructability risks. The authors highlight the importance of close collaboration between designers and contractors and suggest the method may suit other projects with difficult, variable ground conditions.
Keywords
steel piles
marine construction
Dampier
Western Australia
reverse-circulation drilling
down-the-hole hammer
granite socket
contiguous wall
rock fill
variable ground conditions
×
Please select your language
1
English