false
OasisLMS
Login
Catalog
Is Excess Pore Water Pressure Build up an Engineer ...
PPT Presentation
PPT Presentation
Back to course
Pdf Summary
The presentation examines whether excess pore-water pressure buildup should be treated as an engineering demand parameter in deep-excavation analyses. Fully coupled finite-element simulations of a flexible excavation support system in soft clay used a hypoplasticity model and a groundwater table 1 m below the surface.<br /><br />Parametric studies investigated how excavation rate and soil hydraulic conductivity affect the response, including changes in a dimensionless α parameter and maximum vertical surface settlement. Results were presented across different excavation-rate-to-conductivity ratios and excavation geometries, indicating that the degree of hydraulic coupling matters when estimating excavation-induced movements.<br /><br />The proposed assessment method uses α, with a threshold near 0.3, to guide whether an undrained analysis is sufficient or a fully coupled solid–fluid analysis is recommended. It estimates settlement responses using figures and semi-empirical methods, including Clough et al. (1989), and is compared with excavation case histories.<br /><br />Overall, the work presents excess pore-water pressure effects as relevant to selecting an appropriate analysis approach: excavation rate and hydraulic conductivity influence whether an undrained approximation can represent the response or whether full soil–fluid coupling is needed.
Keywords
excess pore-water pressure
deep excavation
finite-element simulation
soft clay
hydraulic conductivity
excavation rate
groundwater table
surface settlement
hydraulic coupling
undrained analysis
×
Please select your language
1
English