false
OasisLMS
Login
Catalog
LTP and Working Platform Design and Construction u ...
PPT Presentation
PPT Presentation
Back to course
Pdf Summary
The presentation explains the design and construction of working platforms and load transfer platforms (LTPs) used with ground improvement. Working platforms provide temporary support for construction equipment, while LTPs transfer loads for longer-term conditions. Both redistribute loads and improve soil stability.<br /><br />Crawler cranes can impose temporary pressures that exceed permanent building loads. Platform design must therefore address both bearing-capacity failure and settlement. Crane-track bearing capacity may be lower than that of an embedded footing, and differential settlement can tilt a crane enough to invalidate its load chart. Design criteria should account for equipment loads, soil conditions, allowable settlement, and construction-stage risks.<br /><br />Load transfer can occur through beam bending, catenary action, or soil arching. Chemically treated soil can form a compression-only arch when laterally confined; geosynthetics can provide tensile resistance. On-site soil treatment may avoid imported material and reduce truck traffic.<br /><br />Common binders include lime, cement, and lime-cement blends. A representative-soil mix design should be completed before construction, typically using bench tests to select the treatment recipe and target strength. Construction methods vary: cement-treated soil is generally mixed and compacted the same day, while lime treatment may require initial mixing followed by final mixing and compaction the next day.<br /><br />Successful projects require coordinated design criteria, appropriate mix design, quality control of spread rate, treatment thickness and compaction, and sufficient hydration and curing. Risks include loading the platform before it has cured and repeated channel loading, especially in wet conditions. Properly designed and built, chemically treated platforms can offer a fast, predictable and cost-effective solution using site soils.
Keywords
working platforms
load transfer platforms
ground improvement
crawler cranes
bearing capacity
settlement
soil arching
geosynthetics
cement treatment
quality control
×
Please select your language
1
English