Load Testing of a 117-Year-Old Pile Raft
PPT Presentation
PPT Presentation
Back to course
Pdf Summary
The presentation describes the assessment and reuse of the approximately 117-year-old foundations at the Gowanus Powerhouse, now being redeveloped as Powerhouse Arts in Brooklyn. The 2.5-acre project includes renovation of the turbine hall, reconstruction of the boiler house, and new site and waterfront improvements.<br /><br />The historic boiler house and turbine hall sit on six-foot-thick concrete rafts supported by timber piles spaced about five feet apart. Beneath them are fill, soft estuarine deposits, and glacial soils; investigations also identified voids under parts of the turbine hall.<br /><br />To meet requirements for foundation reuse, the project team inspected the existing foundations in test pits, investigated subsurface voids, and used expansive chemical grout to improve ground support. New York City’s Department of Buildings required mass load testing to evaluate how the pile groups performed under load. Two tests simulated proposed increases in building load: the boiler-house test applied 4,000 pounds per square foot against a 2,000-psf design increase, while the turbine-hall test applied 1,900 psf against a 950-psf increase. Both tests passed.<br /><br />The project demonstrates that carefully investigated and tested historic foundations can be adapted for new use. Reusing the existing pile rafts avoided the need for entirely new foundations, offering potential savings in cost, time, and materials while reducing environmental risks.
Keywords
Gowanus Powerhouse
foundation reuse
historic foundations
Brooklyn redevelopment
Powerhouse Arts
turbine hall
boiler house
timber piles
mass load testing
chemical grout
×
Please select your language
1
English