false
OasisLMS
Login
Catalog
Major Landslide Remediation in an Urban Setting
Video
Video
Back to course
[Please upgrade your browser to play this video content]
Video Transcription
Video Summary
David Salter of DRS Engineering presents a decade-long landslide remediation project in Bel Air, Los Angeles, undertaken for a private family. A waterline break reactivated part of an ancient landslide, damaging a house and threatening the property. The work involved excavating up to 100 feet to remove unstable material, installing extensive temporary shoring, and rebuilding the site to create new building lots.<br /><br />Because a neighboring owner would not allow tiebacks, engineers devised a two-stage excavation: a braced trench was excavated and backfilled, then its pipes served as dead men for the second excavation. Excess soil was used to fill a nearby canyon, supported by a tall caisson-and-shotcrete wall with concrete dead men and tie rods. The project faced logistical constraints, complex wall interactions, changing house plans, and settlement concerns. Extensive monitoring and cooperation among the owner, contractor, and geotechnical team helped complete the work. The new lots were later sold and developed.
Keywords
landslide remediation
Bel Air Los Angeles
temporary shoring
deep excavation
caisson and shotcrete wall
geotechnical engineering
×
Please select your language
1
English