false
OasisLMS
Login
Catalog
Muskrat Falls North Dam Grout Curtain with Gin Pri ...
Video
Video
Back to course
[Please upgrade your browser to play this video content]
Video Transcription
Video Summary
The presentation reviewed the 2018 JIN grouting program at the Musgrave Falls hydroelectric project, designed to reduce seepage beneath the dam to one Lugeon or less. Although the bedrock was generally strong, low-permeability granite, joints and faults created localized water-flow paths.<br /><br />The grout intensity number (JIN) method used one stable grout mix and adjusted pressure and flow together to suit the rock, helping prevent hydraulic fracturing. Field trials calibrated equipment, tested the rock and grout, and refined the JIN parameters and refusal criteria. Production grouting was carried out in stages from a confined gallery, with drilling, grout properties, pressure and flow monitored and quality-checked.<br /><br />Higher grout takes were generally found deeper in the rock. Additional holes treated these areas, and verification drilling and water tests showed permeability below one Lugeon. The presenter concluded that the grouting program successfully sealed the targeted fissures.
Keywords
JIN grouting
Musgrave Falls
hydroelectric project
seepage reduction
grout permeability
×
Please select your language
1
English