Pdf Summary
The paper describes the reconstruction of three historic Greenwich Village townhouses, joined into one property while preserving their landmark façades. The project involved completely gutting the buildings, removing a shared load-bearing party wall and parts of the rear wall, and excavating two full-footprint sub-cellars up to 24 feet below grade. The neighboring owner’s refusal to permit underpinning added significant geotechnical and construction challenges.<br /><br />Before demolition, engineers installed temporary, multi-level steel diaphragms to stabilize the perimeter brick walls and transfer wind loads. A braced vertical shear frame, supported by rock-socketed micropiles, provided an alternative load path when the party wall was removed. A separate frame of needle beams and clamps supported the rear wall while portions were opened for construction access. Excavation support included braced underpinning and an offset micropile soldier-pile wall beside the neighbor’s property.<br /><br />An automated monitoring system tracked prisms on the project and adjacent buildings hourly, supplemented by liquid-level sensors. Monitoring continued around the clock during excavation and foundation work for 18 months. Movement was generally negligible, with a localized maximum settlement reported.<br /><br />Key lessons included the need for close, frequent coordination among design teams, contractors, and the steel fabricator. Severe site constraints required steel components to be short, lightweight, and carefully field-measured. The authors recommend allowing for construction loads on temporary platforms, preparing alternative connections to address field conditions, and designing for reasonable misalignment. They also highlight the potential value of 3D/BIM coordination to identify conflicts between temporary and permanent systems earlier.
Keywords
Greenwich Village
townhouse reconstruction
historic preservation
temporary steel diaphragms
load-bearing party wall
micropiles
excavation support
geotechnical engineering
structural monitoring
BIM coordination
×
Please select your language
1
English