false
OasisLMS
Login
Catalog
Noise Attenuation and Reduced Risk Associated with ...
Paper
Paper
Back to course
Pdf Summary
The document presents a double-walled steel pile designed to reduce underwater noise from impact pile driving while using standard vibratory or impact hammers. Conventional piles generate noise as they expand during hammer strikes; sound also travels through the seabed and can re-enter the water, limiting the effectiveness of measures such as bubble curtains.<br /><br />The new design sleeves a smaller pile or reusable mandrel inside a larger steel pile, joined by a shoe that encloses the structure along its length. This is intended to contain noise, allowing little to escape except near the pile toe. Modeling, prototype tests, and full-scale trials in Puget Sound reported peak-noise reductions of about 14–20 dB compared with conventional piles at approximately 10 meters. One test found reductions exceeding 20 dB, compared with about 6 dB from a bubble curtain. Testing also indicated drivability similar to standard piles, with preliminary calculations suggesting equivalent or better structural performance.<br /><br />Lower noise at the source could substantially shrink areas where regulatory sound thresholds are exceeded. The document estimates that this could reduce exposure risks for sensitive aquatic species and the size of required biological monitoring zones, potentially requiring fewer monitoring boats and staff. It also argues that avoiding separate attenuation equipment and reducing monitoring and work interruptions could simplify permitting and construction. A hypothetical schedule estimates installation of three piles could take three hours with the double-walled system, versus eight hours with bubble curtains; this is a projected comparison, not a general guarantee.<br /><br />Overall, the document argues that double-walled piles may offer both environmental and project-delivery benefits by reducing underwater noise without requiring separate attenuation devices.
Keywords
double-walled steel pile
underwater noise reduction
impact pile driving
vibratory hammer
sound attenuation
bubble curtain
Puget Sound trials
biological monitoring zones
pile drivability
environmental mitigation
×
Please select your language
1
English