Pdf Summary
The Mount Olivet Road (MOR) drop shaft was built as part of Washington, D.C.’s Northeast Boundary Tunnel (NEBT), a 26,700-foot combined sewer overflow storage and conveyance project. The MOR site included a 122-foot-deep drop shaft, a 73-foot-deep access chamber, and a 39-foot-deep ventilation structure, with several excavation-support walls shared between structures.<br /><br />Design requirements included a 100-year service life for permanent works, compliance with ACI 350 for underground concrete structures, and protection against groundwater pressures during construction. The design used hand calculations for excavation support, supplemented by finite element modeling (FEM) to assess three-dimensional loading, predict ground movement, develop groundwater control measures, and evaluate partially completed permanent structures.<br /><br />FEM analyses compared short-term undrained and drained soil conditions. Instrumentation data showed that the undrained model best represented excavation-support loads and deformation of the permanent shaft structure. Drained-condition modeling was not considered representative of actual construction behavior, but helped prepare contingency measures for unexpected ground conditions.<br /><br />Monitoring, with established action and maximum thresholds, reduced risks during near-surface excavations. Contingency measures were prepared in case monitored movements or bracing loads exceeded action levels.
Keywords
Mount Olivet Road
Northeast Boundary Tunnel
combined sewer overflow
drop shaft
excavation support
finite element modeling
groundwater control
undrained soil conditions
instrumentation monitoring
ACI 350
×