Northeast Boundary Tunnel - Mount Olivet Road Drop ...
Video
Video
Back to course
[Please upgrade your browser to play this video content]
Video Transcription
Video Summary
Jeremiah Jezerskin presented the construction and design challenges at the Mont Olivet Road site on Washington, D.C.’s Northeast Boundary Tunnel. The site included a 122-foot-deep drop shaft, a ventilation vault, and a deep approach channel, all built in variable Potomac clay and granular soils. The original construction sequence was changed when the tunnel-boring machine arrived earlier than expected, requiring all three excavations to remain open simultaneously.<br /><br />Finite-element modeling assessed whether the unreinforced slurry-wall shaft and permanent structures could withstand the resulting unbalanced loads. Because short-term undrained soil behavior was critical, the team modeled both drained and undrained conditions and evaluated time-dependent soil response. Instrumentation showed strut loads closely matched the model’s predictions, generally within 5%. Monitoring and contingency planning helped manage risks and maintain the schedule. The project demonstrated the value of time-dependent analysis and field monitoring for complex deep excavations.
Keywords
Northeast Boundary Tunnel
Mont Olivet Road
deep excavation
finite-element modeling
undrained soil behavior
×
Please select your language
1
English