false
OasisLMS
Login
Catalog
PLENARY SESSION 4: Agency and Owner Panel - Naviga ...
Video
Video
Back to course
[Please upgrade your browser to play this video content]
Video Transcription
Video Summary
The session brought together agency and owner representatives to discuss how the geotechnical industry can adapt to changing codes, technologies, project demands, and climate conditions.<br /><br />WSDOT described the scale of its fish-passage program—hundreds of crossings to address by 2030—and the pressure this creates alongside other major infrastructure programs. The agency is updating its geotechnical design manual, reconsidering risk allocation, and learning to use progressive design-build while strengthening partnerships with industry.<br /><br />Seattle’s permitting department highlighted review challenges involving seismic ground improvement, liquefaction, settlement, basement-wall pressures, and seismic retrofits. It uses peer review for some complex ground-improvement designs and is working with researchers and local engineers to develop guidance.<br /><br />California’s Department of Water Resources recently gained authority to use design-build, construction manager/general contractor, and progressive design-build. It is developing selection methods, procurement documents, and staff capacity while navigating a major cultural shift from in-house design.<br /><br />Federal Lands Highway shared a Denali National Park project where a bridge will span a landslide accelerated by permafrost thaw. Climate modeling and LiDAR/photogrammetry help inform design and track ground movement. The Army Corps of Engineers discussed a fast-tracked Sacramento flood-protection program, using industry days, one-on-one discussions, and value engineering to improve collaboration and manage risk.<br /><br />Panelists emphasized early, candid communication, clear and consistent contract requirements, appropriate sharing of geotechnical risk, and procurement methods suited to each project. They also discussed climate-related extremes, including drought, flooding, wildfire, and landslides, and the need to plan for uncertainty.
Keywords
geotechnical industry
WSDOT
fish-passage program
progressive design-build
seismic ground improvement
liquefaction
design-build procurement
climate change impacts
permafrost thaw
bridge landslide
flood protection
geotechnical risk allocation
×
Please select your language
1
English