false
OasisLMS
Login
Catalog
Part II: Construction and Verification of Rigid In ...
Article
Article
Back to course
Pdf Summary
This paper provides guidance on constructing and verifying cementitious, cast-in-place rigid inclusions (RIs), a ground-improvement method used to increase bearing capacity and reduce settlement. Because RI systems vary and often use proprietary equipment and methods, there is no single industry-wide standard, making careful planning and quality control essential.<br /><br />Construction procedures should reflect site soil variability, type, and density. An initial indicator program can relate drilling or driving responses to the expected soil profile and establish suitable termination criteria. Installation logs—preferably continuous electronic monitoring—should record parameters such as drilling pressure and speed, grout volume and pressure, and element depth. Non-conforming installations should be referred to the designer.<br /><br />Grout or concrete quality should be checked through appropriate workability and strength testing. Placed volume should generally meet or exceed the theoretical column volume, but grout factor alone cannot confirm continuity; withdrawal rate and delivery pressure also need monitoring. Groundwater, fissures, karst, soft soils, and organic deposits may create risks such as grout loss, necking, heave, or column breakage. The paper also highlights protecting elements during cutoff, excavation, and subsequent construction.<br /><br />Verification may include integrity tests, exhumation, and load tests. A single-element load test assesses the inclusion’s load–deformation behavior and can help validate installation methods and design assumptions, but it does not assess the load-transfer platform (LTP) or overall system response. Sacrificial LTP tests, group or footing tests, and full-scale embankment tests can provide broader evidence, though they may be costly. Integrity tests such as low-strain impact testing should be interpreted cautiously and, where possible, combined with other methods.<br /><br />Finally, because LTPs are often built by a separate contractor, their subgrade preparation, material, thickness, and compaction require documented inspection and quality assurance. The authors conclude that experienced installers, clear responsibilities, pre-mobilization planning, and robust monitoring reduce construction risks and help ensure system performance.
Keywords
cementitious rigid inclusions
ground improvement
bearing capacity
settlement reduction
quality control
installation monitoring
grout testing
load testing
integrity testing
load-transfer platform
×
Please select your language
1
English