Piling Adjacent to Rail Tunnels at King's Cross Ce ...
Paper
Paper
Back to course
Pdf Summary
The paper describes the design and construction of bored piles for two office buildings, S1 and S3, at King’s Cross Central, directly above Network Rail’s Thameslink twin tunnels. The tunnels have shallow crowns, and some piles were installed within 1.35–1.5 m of their linings. Ground conditions comprised Made Ground over London Clay and the Lambeth Group, including locally water-bearing sand that could have required support fluid during piling.<br /><br />The project team refined pile layouts and construction methods to manage risk and cost. Continuous flight auger (CFA) and rotary bored piles, 600–1,200 mm in diameter and up to approximately 56 m deep, were used. Design changes, including reducing pile numbers and diameters and conducting a preliminary load test at S3, helped shorten piles and avoid support fluid for most works. Installation was sequenced to limit cumulative ground effects, with piles constructed alternately and separated by at least 5 m. PRAD sensors recorded pile verticality, while automated monitoring tracked tunnel movements.<br /><br />Measured tunnel movement was modest: settlements reached no more than 3.3 mm, transverse movement was at most 1 mm, and cross-sectional distortion was less than 1 mm. These results were broadly consistent with predictions, with greater settlement associated with the larger and more numerous piles at S1. The work was completed successfully without compromising tunnel serviceability.<br /><br />The authors conclude that comparable projects require thorough ground investigation, robust and carefully sequenced piling methods, suitable equipment, experienced contractors, and close monitoring and engineering supervision.
Keywords
bored piles
King’s Cross Central
Thameslink tunnels
CFA piles
rotary bored piles
London Clay
Lambeth Group
tunnel settlement
pile monitoring
ground investigation
×
Please select your language
1
English