false
OasisLMS
Login
Catalog
Piling Adjacent to Rail Tunnels at King's Cross Ce ...
Video
Video
Back to course
[Please upgrade your browser to play this video content]
Video Transcription
Video Summary
The presentation describes piling for buildings S1 and S3 at London’s King’s Cross Central, where foundations were installed close to live Network Rail tunnels. The team designed and built CFA and rotary bored piles in London Clay and the Lambeth Group, adapting the S3 design after discovering unexpected water-bearing sand. Rather than use support fluid throughout, they conducted a preliminary load test; its settlement was below predictions, supporting the revised approach. Pile installation and tunnel monitoring were carefully controlled, and measured tunnel movements remained within predicted limits. The speaker highlights thorough site investigation, planning and collaboration as key to the projects’ success.
Keywords
piling
King's Cross Central
Network Rail tunnels
CFA and rotary bored piles
London Clay
×
Please select your language
1
English