Casper, Wyoming’s aging wastewater interceptor along the North Platte River suffered severe corrosion from hydrogen sulfide and exposed reinforcing steel. Although the oversized, unlined concrete pipeline was at high risk of collapse—and a failure could release sewage into a sensitive recreational river—funding and approvals took roughly 14–17 years. The project team conducted inspections, material testing, and risk assessments to demonstrate the urgency and secure support.<br /><br />With limited funding, the city prioritized the most critical sections and selected cured-in-place pipe (CIPP) and sliplining. Construction began in 2022, requiring extensive wastewater bypassing, careful traffic management, and work around difficult features such as a highway crossing and pipes cut by a gas line. Record cold forced a winter shutdown, but work resumed and was completed in 2023.<br /><br />The rehabilitation cost about $6.5 million, came in under budget, and received a trenchless technology project-of-the-year award. Approximately $24 million in pipeline work remains.
Keywords
wastewater interceptor
North Platte River
cured-in-place pipe
sliplining
trenchless rehabilitation
Casper Wyoming
×
Please select your language
1
English