false
OasisLMS
Login
Catalog
Rebuilding Dams in The Sand Hills: Challenges of S ...
PPT Presentation
PPT Presentation
Back to course
Pdf Summary
Langley Pond Dam in South Carolina is a 1,850-foot-long earthen embankment, approximately 35 feet high, with a history of seepage and internal erosion near and beneath its concrete spillway. After downstream boils were observed in 2014, the reservoir was drawn down and subsurface investigations were conducted. The dam’s challenging Sand Hills geology included loose, washed sediments and soft alluvium; cone penetration test (CPT) soundings helped characterize ground conditions.<br /><br />Remedial work carried out from 2018 to 2020 included a slag-cement cement-bentonite (SCCB) seepage-control barrier. Installed in two phases, the barrier used overlapping panels approximately 2.5 feet wide and extending to depths of about 65 feet, where they were keyed into residual soil beneath coastal plain deposits. Its specified permeability was no greater than 1 × 10⁻⁷ ft/s.<br /><br />Loose soils beneath part of the upstream slope could not be undercut because of the nearby temporary cofferdam. SCCB shear walls were therefore installed to improve slope stability. Designed to address extrusion, bearing resistance, overturning, and global stability, the walls were about 25 feet deep and spaced 20 feet apart.<br /><br />The project demonstrates how CPT-based profiling, a deep seepage barrier, and targeted shear walls can address seepage and stability challenges in difficult ground conditions.
Keywords
Langley Pond Dam
South Carolina
earthen embankment
seepage control
internal erosion
cone penetration test
slag-cement cement-bentonite
permeability barrier
shear walls
slope stability
×
Please select your language
1
English