false
OasisLMS
Login
Catalog
Reconstruction of the Initial 400 Ft of the Spiro ...
Video
Video
Back to course
[Please upgrade your browser to play this video content]
Video Transcription
Video Summary
Dan Escobar of Harrison Western describes the rehabilitation of a historic mining tunnel in Park City, Utah. Begun around 1900 for mining and dewatering, the tunnel later served as a skier subway before becoming a major water source, supplying about 35% of the city’s municipal water.<br /><br />The project stabilized the first 400 feet, including a partially collapsed portal, unstable ground, and a junction where two tunnels meet. Crews excavated and reinforced the hillside with soil nails, installed temporary and permanent tunnel supports, replaced the bulkhead, and built a new vault and piping system to direct water either to treatment or local streams.<br /><br />Construction involved oversized cavities, difficult ground, and repeated flooding after falling rock crushed a buried pipe. The team adapted its support and pipe-protection plans to keep work safe and maintain water control. The portal was rebuilt with drainage and architectural finishes that reused historic tunnel timbers, preserving the site’s character while improving its function.
Keywords
Park City tunnel rehabilitation
historic mining tunnel
water supply infrastructure
soil nailing stabilization
tunnel portal reconstruction
×
Please select your language
1
English