Remedial Base Grouting of Caissons under Artesian ...
Video
Video
Back to course
[Please upgrade your browser to play this video content]
Video Transcription
Video Summary
A senior project manager describes remedial base grouting beneath king piles at Toronto’s Forest Hill Station, part of the Eglinton Crosstown LRT. Disturbed, relatively loose soil and artesian groundwater conditions prompted permeation grouting to stabilize the pile bases. Because of reinforced concrete, utilities, limited access, and the need to keep surface construction moving, the team worked from a nearby tunnel. They installed nine angled, multi-port grout pipes at four locations, using staged drilling and pressure grouting. Quality checks included alignment surveys, grout testing, pressure and flow monitoring, and structural monitoring. The work injected about eight cubic metres of grout and finished without delaying the contractor’s schedule.
Keywords
base grouting
king piles
permeation grouting
artesian groundwater
Eglinton Crosstown LRT
×
Please select your language
1
English