false
OasisLMS
Login
Catalog
Results of Trial Grouting at Ontario Power Generat ...
Video
Video
Back to course
[Please upgrade your browser to play this video content]
Video Transcription
Video Summary
At Ontario Power Generation’s Sir Adam Beck pumped-storage facility, a new grout curtain was designed to reduce seepage through shallow bedrock beneath the reservoir dike. A full-scale trial tested the installation method, especially contact grouting intended to protect the clay core and treat the overburden–bedrock interface. Excavation showed the barrier bags and annulus filling worked, but the interface contained little erodible material and took little grout. The trial also revealed potential voids beneath inflated bags. Based on these findings, the team removed contact grouting, repositioned the bags, and later simplified the installation further. The trial reduced scope, cost, schedule, and construction risk.
Keywords
grout curtain
pumped-storage facility
seepage control
contact grouting
bedrock interface
×
Please select your language
1
English