false
OasisLMS
Login
Catalog
Reuse of Existing Piles Study – Hwy 417
PPT Presentation
PPT Presentation
Back to course
Pdf Summary
The study evaluated whether existing piles at the Woodroffe Avenue and Richmond Road bridges on Ontario Highway 417 could be reused during rapid bridge replacements. Corrosion concerns and seismic performance requirements could otherwise necessitate supplemental deep foundations, adding cost and construction time.<br /><br />Investigations included exposing piles beneath wingwalls, cleaning them by abrasive blasting, and assessing corrosion through visual inspection, pit-depth measurements, ultrasonic testing, and soil analyses. The team mapped pitting and estimated cross-sectional area loss. Measured pitting rates were 0.11 mm/year at Woodroffe and 0.07 mm/year at Richmond, while calculated average site corrosion rates were 0.015 mm/year and 0.007 mm/year, respectively. The study recommends using a conservative rate of 0.015 mm/year for both sites and other nearby bridges.<br /><br />The in-situ assessments enabled the design team to validate the piles’ predicted 75-year service life. The estimated cost of supplementary investigations was $400,000, compared with projected construction savings of $1.65 million from avoiding additional piles and abutment modifications—an estimated net saving of $1.25 million. Reusing the piles would also reduce impacts on the public and the environment.
Keywords
bridge pile reuse
Ontario Highway 417
corrosion assessment
rapid bridge replacement
seismic performance
deep foundations
ultrasonic testing
service life validation
cost savings
environmental impact
×
Please select your language
1
English