false
OasisLMS
Login
Catalog
Reuse of Existing Piles Study – Hwy 417
Video
Video
Back to course
[Please upgrade your browser to play this video content]
Video Transcription
Video Summary
Ontario’s Ministry of Transportation assessed whether foundations on two Highway 417 bridges could be reused during rapid replacements. The bridges, built in 1960, had steel H-piles driven to bedrock. Geotechnical capacity was adequate, but the team needed to verify structural durability and a 75-year service life.<br /><br />At each site, engineers exposed three piles, inspected them visually, measured thickness ultrasonically, and tested soil aggressivity. They mapped pitting and developed an analysis to estimate corrosion rates. Results supported reuse, with conservative projections meeting the design target.<br /><br />The investigation cost about $400,000 and was estimated to save at least $1.25 million, while reducing construction time, public disruption, and environmental impact. The Ministry is building a province-wide database and now requires service providers to consider foundation reuse on every project.
Keywords
Highway 417
foundation reuse
steel H-piles
corrosion assessment
Ontario Ministry of Transportation
×
Please select your language
1
English